Vue de la page 94
93
Computers on Outlets
Shutdown/Restart: A shutdown or restart can be initiated on a computer with either Agent or Client installed by
going to Shutdown/Restart in Computers on Outlets. A window will list the computers which can be shutdown or
restarted. Clicking “X” will remove that computer from the list and they will not be shutdown/restart.
Note: If a PDU is connected to a UPS, shutting down computers on UPS outlets will result in shutdown computers
in the PDU.
A confirmation window lists computers able to be shutdown
Power Control
Power Off: Click Power Off and a confirmation window will appear. Decide whether to perform an immediate or a
sequenced power off then click OK to begin. When a UPS or a PDU initiates a sequenced power off, computers
connected to the UPS/PDU/ATS that have Agent or Client installed will initiate shutdown prior to the sequenced
power off.
Note: An immediate power off will likely result in connected computers losing power.
A confirmation window of a PDU power off operation
Power On: Click Power On to have the UPS/PDU/ATS turn on output power. Decide whether to turn on output
power immediately or after a delay in the confirmation window. Click OK to begin.
Note: Some computers require manual booting when a UPS or a PDU powers on. To change this, set the
computers BIOS to boot when power is restored.